Wednesday, October 13, 2010

High-Poly Model: Progress

NEW IDEA: SKETCH

IMPORTANT NOTE: In developing my model, I came to the realisation that changing the dramatic and geometric form of the building wasn't the best way to represent Frank Gehry's initial ideas, and wasn't really a testament to his work. Therefore, I have altered the function and purpose of the structure, ever so slightly, but significantly. It is now a Theater for the performing arts. It has a single theatre that is intimate for small productions. I feel as though with this function, I am able to create something equally as striking as Frank Gehry's Vitra Design Museum.

First Draft Render: Basic shell of structure

Internal Render: At this stage, I am planing to change the wood texture. It doesn't express the curvilinear form of the theatre walls. Also I need to change the intensity of the lighting!

Perspective: Further developed Sketchup Model.

Site Plan: The site plan will include a quite hilly landscape.

No comments:

Post a Comment